- In the Business Model and Mapping layer, expand a dimension and then expand the highest level (grand total level) of the dimension.
- Double-click a logical level below the grand total level.
- In the Logical Level dialog box, click the Keys tab.
- In the Keys tab, from the Primary key drop-down list, select a level key.
- To add a column to the list, perform the following steps:
- If the level is in a time dimension, you can select chronological keys and sort the keys by name.
- (Optional) Type a description for the key and then click OK.
- Repeat Step 2 through Step 7 to add primary keys to other logical levels.
- In the Logical Level dialog box, click OK
No comments:
Post a Comment